A central theme of these posts – all of the windows needed to be replaced. This house has big, beautiful windows that bring in an amazing amount of light. The windows were one of our favorite features of the house. Part of modernizing the house meant rebuilding the window openings in the rooms where the kitchens and baths were going to be located. The original windows went nearly to the floor, so we re-built them so that we could put the cabinetry under them. Before we removed the old ones, a little art was created.
1119: Windows
Categories:
Related Post
1119: Serious, Serious Demo1119: Serious, Serious Demo
Once we got all of the appliances, walls, electrical and plumbing removed we got to work on the floors. This was when the true extent of the termite damage was
1119: Re-building Begins1119: Re-building Begins
Rebuilding begins!!! The new plumbing service line is in, so we can start building over top of it. The first step is joists – laser leveled. Being particular now, saves time
1119: Drywall, Nearing the End1119: Drywall, Nearing the End
At this point, framing, insulation, electrical and plumbing are pretty much done. We’re ready to start sealing it all in with drywall. This is when it really starts to feel