Rebuilding begins!!! The new plumbing service line is in, so we can start building over top of it. The first step is joists – laser leveled. Being particular now, saves time later.
1119: Re-building Begins
Categories:
Related Post
1119: Drywall, Nearing the End1119: Drywall, Nearing the End
At this point, framing, insulation, electrical and plumbing are pretty much done. We’re ready to start sealing it all in with drywall. This is when it really starts to feel
1119: NOLA Curb Appeal1119: NOLA Curb Appeal
One of the first things about this house that sprung to mind was New Orleans. It was the double porches and wrought iron. That impression impacted a lot of the
1119: Serious, Serious Demo1119: Serious, Serious Demo
Once we got all of the appliances, walls, electrical and plumbing removed we got to work on the floors. This was when the true extent of the termite damage was