Rebuilding begins!!! The new plumbing service line is in, so we can start building over top of it. The first step is joists – laser leveled. Being particular now, saves time later.
1119: Re-building Begins

Categories:
Related Post

1119: Windows1119: Windows
A central theme of these posts – all of the windows needed to be replaced. This house has big, beautiful windows that bring in an amazing amount of light. The

1119: Interior Reveal: Unit 21119: Interior Reveal: Unit 2
Unit 2 – the second floor unit. The layout of this one is a little different. The kitchen and living room are more separate – one in each of the

1119: Serious, Serious Demo1119: Serious, Serious Demo
Once we got all of the appliances, walls, electrical and plumbing removed we got to work on the floors. This was when the true extent of the termite damage was